
Shaun
- Total activity 338
- Last activity
- Member since
- Following 0 users
- Followed by 4 users
- Votes 0
- Subscriptions 174
Articles
Recent activity by Shaun-
Import from Excel file
Make sure you have the things listed below before starting: An Excel file that contains information about building materials – material names and their quantities. One Click LCA account and licen...
-
Autodesk Revit integration
Make sure you have the things listed below before starting: Autodesk Revit 2016, 2017, 2018, 2019, 2020, 2021, 2022 or 2023 version installed (please note that Revit LT does not support any plugi...
-
Finding Metal Resources
Metal play a key role in the structural function of a building. Different type of metal are used for different structural purposes and can be used for façade as well. As a rule of thumb, if you ha...
-
Finding Concrete Resources
The major factor defining the environmental impacts of concrete is the amount of cement in the product which depends on the concrete strength class (e.g. C25/30 in Europe). If you cannot find the e...
-
NS 3720 Klimagassverktøyet One Click LCA Norge
Formål og definisjoner Hva er One Click LCA og hva kan man bruke det til? One Click LCA Norge er et verktøy for å analysere og kommunisere utslippskonsekvenser ved planlegging og prosjektering av b...
-
Release Notes July 2022
What's New in One Click LCA July 2022? Check out the release notes below. If you want to read more details about the July release, download the PDF file from the attachment. Continued performance...
-
What's new in 2022?
14th July 2022 - GLA/RICS tool update (all UK users) This is a clarification on an earlier update processed on June 24th, mentioned in the June Release Notes. A notification regarding this update w...
-
End of Life Scenarios for Construction Products
In One Click LCA's Building Life Cycle Assessment module we support three end of life settings: Material-locked Market scenarios, user adjustable with Expert feature EPD EOL scenario, user adjust...
-
Selecting Project Parameters
What are the project parameters? For building and infrastructure projects you will need to set up calculation parameters before you start. Among these are life-cycle assessment and life-cycle costi...
-
Building Information Model Creation Guidelines for Model Use with One Click LCA
This article explains how you can ensure that your BIM models throughout different stages of design can be used in conjunction with One Click LCA. The guidance is not specific to any modelling soft...